Job Safety Analysis: Ditch Cleaning

Print
Step Potential Hazard Control
Inspect ditch and surrounding area Traffic hazards, unstable banks, hidden debris, wildlife Evaluate site conditions before work begins, establish traffic control if near roadway, watch for snakes, insects, or sharp debris
Position trucks and equipment Vehicle movement, struck by traffic, rollaway Park on stable ground, set parking brake, use wheel chocks, activate warning lights
Establish work zone Motorists entering work area, poor visibility Deploy cones, signs, and barriers according to MUTCD guidelines, wear high visibility PPE
Remove debris by hand or with tools Cuts, punctures, back strain, biological hazards Wear gloves, use shovels or rakes when possible, lift properly, avoid direct contact with contaminated material
Operate excavator, backhoe, or ditching equipment Struck by equipment, rollover, underground utility damage Maintain safe distance from moving equipment, use spotter if needed, verify utility locations before digging
Clean sediment and vegetation from ditch Slips, trips, falls, exposure to insects or poison plants Maintain secure footing, avoid overreaching, identify poison ivy or hazardous vegetation before work
Restore water flow through ditch or culvert Sudden water movement, erosion, undermining roadway Monitor flow conditions carefully, stop work if erosion develops, stabilize disturbed soil if needed
Load and transport debris Falling material, back strain, equipment hazards Secure loads properly, use mechanical assistance when possible, avoid standing under raised buckets
Inspect completed ditch line Missed blockages, unstable banks Verify water flow is unobstructed, inspect for erosion or collapse risks
Remove traffic control and clean work area Worker exposure to traffic, leftover debris Retrieve cones and signs safely, remove tools and debris from roadway and shoulder
Dispose of sediment and debris Environmental contamination, spills Dispose of material at approved site, prevent runoff into waterways

Suggested Personal Protective Equipment

  • Hard hat
  • Safety glasses or face shield
  • High visibility vest or Class 3 roadway garment
  • Steel toe boots with slip resistant soles
  • Waterproof gloves
  • Hearing protection when operating equipment
  • Respiratory protection when dust, mold, or contaminated material is present
  • Waterproof clothing or rain gear when working in wet conditions

Always have a complete, well-stocked first aid kit available.

JSA Category: Stormwater, Drainage, and Waterways

* The steps, hazards, and controls displayed above may be incomplete or not suit your department's needs. All job safety analyses should be a completed with frontline worker input to ensure that each potential hazard is identified and mitigated.

Please read about The Essentials Elements of a Solid Job Safety Anaylsis here.

Thank you to our primary sponsor, Roadwurx, which is a simple asset management platform for small public works and road departments.

Job Safety Analysis
Step Potential Hazard Control
Inspect ditch and surrounding area Traffic hazards, unstable banks, hidden debris, wildlife Evaluate site conditions before work begins, establish traffic control if near roadway, watch for snakes, insects, or sharp debris
Position trucks and equipment Vehicle movement, struck by traffic, rollaway Park on stable ground, set parking brake, use wheel chocks, activate warning lights
Establish work zone Motorists entering work area, poor visibility Deploy cones, signs, and barriers according to MUTCD guidelines, wear high visibility PPE
Remove debris by hand or with tools Cuts, punctures, back strain, biological hazards Wear gloves, use shovels or rakes when possible, lift properly, avoid direct contact with contaminated material
Operate excavator, backhoe, or ditching equipment Struck by equipment, rollover, underground utility damage Maintain safe distance from moving equipment, use spotter if needed, verify utility locations before digging
Clean sediment and vegetation from ditch Slips, trips, falls, exposure to insects or poison plants Maintain secure footing, avoid overreaching, identify poison ivy or hazardous vegetation before work
Restore water flow through ditch or culvert Sudden water movement, erosion, undermining roadway Monitor flow conditions carefully, stop work if erosion develops, stabilize disturbed soil if needed
Load and transport debris Falling material, back strain, equipment hazards Secure loads properly, use mechanical assistance when possible, avoid standing under raised buckets
Inspect completed ditch line Missed blockages, unstable banks Verify water flow is unobstructed, inspect for erosion or collapse risks
Remove traffic control and clean work area Worker exposure to traffic, leftover debris Retrieve cones and signs safely, remove tools and debris from roadway and shoulder
Dispose of sediment and debris Environmental contamination, spills Dispose of material at approved site, prevent runoff into waterways
Suggested Personal Protective Equipment